一级特色黄色片_国产71区_免费超级乱婬视频播放_久久国产亚洲精品AV麻豆_最近中文字幕2018国语_午夜精品亚洲一区二区三区嫩草_一级二级在线观看_国产成人综合亚洲专区_日韩免费高清在线观看_小77成人论坛_国模和精品嫩模私拍视频_曰韩免费_成年男女视频免费网站有哪些_免费无码av片在线观看_日本黄色片在线播放_av成人资源网_两人性潮高免费视频看_黄a视频在线观看_精品人妻一区二区A片_色综合久久中文娱乐网_国产性色_日本深夜福利_91精品久久久久久久久_色中网_国产伦精品一区二区三区免费迷_免费黄色三级毛片_草莓视频在线观看免费播放高清视频_日韩精品无码专区_www.在线视频_久草免费av
hotline:
010-53033961
中文
Home
About
News
Product
Service
Case
Contact
hotline:
010-59393252
×
China Southern Airlines Hangar Project at Daxing New Airport
time:2019-01-22
hits:6526次
source:正弘奧能
<p> <br /> </p> <p> <span line-height:2;"="" style="font-size: 16px;"><strong>Project Name: </strong>China Southern Airlines Hangar Project at Daxing New Airport<strong><br /> <br /> <br /> Project Location: </strong></span><span style="font-size:16px;">Daxing District, Beijing</span> </p> <p> <span line-height:2;"="" style="font-size: 16px;"><strong><br /> <br /> Project Overview:</strong> Hangar No. 1 of China Southern Airlines Base at Beijing's new airport has a total area of 39,000 square meters, which is equivalent to 5 football fields or 80 basketball courts. It consists of a maintenance hangar hall and a four-story annex building. It is designed to accommodate five wide-body aircraft and three narrow-body aircraft, which can amount to twelve aircraft including two Airbus A380 and three Boeing 777 at the same time. This design can meet the flexibility of parking aircraft of different models and different maintenance requirements. The project is the largest single-unit project in the China Southern Airlines base at Beijing's new airport. After its completion, it will become one of the largest aircraft maintenance hangars in Asia and in the world. (Citation: China Southern Airlines official website news announcement)<br /> </span> </p> <p> <span line-height:2;"="" style="font-size: 16px;"><strong></strong></span> </p> <p> <span line-height:2;"="" style="font-size: 16px;"></span><br /> <span line-height:2;"="" style="font-size: 16px;"><strong>Project Features: </strong></span> </p> <p> <span line-height:2;"="" style="font-size: 16px;">1. Large-span, high-rise hangar</span> </p> <p> <span line-height:2;"="" style="font-size: 16px;">2. Large window and door area, resulting in large heat transfer coefficient in the enclosure structure</span><br /> <span line-height:2;"="" style="font-size: 16px;">3. Large temperature gradient inside the architecture, significant air stratification, which causes the top to be warmer and the bottom to be cooler, resulting in faster heat dissipation from the roof</span> </p> <div style="text-align:center;"> </div> <span line-height:2;"="" style="white-space: normal; font-size: 16px;">4. Spacious building and higher temperature requirement, needing faster heating rate</span> <p> <br /> </p> <p> <span line-height:2;"="" style="white-space: normal; font-size: 16px;">5. Doors open frequently, and the intrusion of cold wind consumes a lot of heat.</span> </p> <p> <span style="font-size:16px;">6. The hangar is mainly used for airplane maintenance, therefore requiring more safety concerns.<br /> </span><br /> <span line-height:2;"="" style="white-space: normal; font-size: 16px;"><strong>Equipment Usage:</strong>We have chosen 84 sets of IMPRESIND Tub-One gas-fired radiant heating products for this project. The project is currently under early-phase construction. <br /> </span><span></span> </p> <p> <br /> </p> <p style="text-align:center;"> <span line-height:2;"="" style="font-size: 16px;"><img src="http://www.wmkan.com/Uploads/image/20190418/20190418191101_66977.jpg" alt="" /></span> </p> <p style="text-align:center;"> <img src="http://www.wmkan.com/Uploads/image/20190418/20190418191101_97495.jpg" alt="" /> </p> <div style="text-align:center;"> <img src="http://www.wmkan.com/Uploads/image/20190418/20190418191102_41387.jpg" alt="" /> </div> <p style="text-align:center;"> <img src="http://www.wmkan.com/Uploads/image/20190412/20190412171053_74094.jpg" alt="" /> </p> <div style="text-align:center;"> <img src="http://zhan.w72.mc-test.com/Uploads/image/20190412/20190412171102_62363.jpg" alt="" /> </div> <p> <br /> </p>
prev:Airplane Hangar Project of Xinjiang Urumqi Aviation Production & Operation Base
Returns a list of
next:China Eastern Airlines Hangar Project at Daxing New Airport